Renovation planning

Plan your renovation before anyone prices it

A clear brief is the difference between quotations you can compare and quotations that only look similar. Start with the rooms, the finishes and the order of work.

Stages

The order a renovation usually follows

Not every project needs every stage, but agreeing the order early avoids rework and keeps trades out of each other's way.

  1. Survey and measure

    Measurements, photographs and a record of existing services, damage and constraints.

  2. Design decisions

    Layout, finishes, fixtures and appliances agreed, with drawings where the work needs them.

  3. Material sign-off

    Samples and specifications approved before anything is ordered, with lead times noted.

  4. Protection and strip-out

    Floors, furniture and neighbouring areas protected before removal work starts.

  5. First fix

    Plumbing, electrical and AC alterations routed before walls and ceilings are closed.

  6. Inspection

    Concealed work checked, and wet areas tested, before finishes cover them.

  7. Finishes

    Waterproofing, tiling, flooring, ceilings, joinery and painting in the agreed order.

  8. Snag and handover

    A joint walk-round, a snag list, cleaning and the handover of documents.

Finishes

Try finish combinations

Kitchen elevation showing the selected wall, floor and cabinet finishes
Walls
Floor
Cabinets

Colours are indicative. Final products, finishes and samples are confirmed during specification.

Decisions

What changes a renovation quotation

Extent of strip-out
Removing tiles, screed or joinery adds labour, disposal and making good.
Layout changes
Moving a sink, toilet or shower relocates supply and waste routes; keeping positions is usually simpler.
Material grade and supply
Named products and who supplies them change both price and programme.
Hidden conditions
Damp, failed waterproofing or uneven substrates found during strip-out may need extra work.
Occupancy and access
Working around residents, restricted hours and lift bookings affect the programme.
Approvals
Building or community requirements can add steps before work begins.

FAQs

Renovation planning questions

How long will my renovation take?

The programme is confirmed after the scope is assessed. Material lead times, approvals and anything found during strip-out can affect it, so a written programme is more reliable than an estimate given before measuring.

Do I need building or community approval?

Many buildings and communities require notice or approval for renovation work, sometimes with rules on working hours and debris. Check early; the brief builder includes a reminder.

Can I renovate one room at a time?

Yes. Phasing can reduce disruption in an occupied home, though it can add protection and set-up costs. The brief helps decide what to group together.

Enquire

Tell us what your property needs

Share the location, the work you have in mind and a few photographs. We will advise on the next step and whether a visit is needed before quoting.

Telephone04 582 4141 Mobile+971 52 568 4874 Emailinfo@cafmglobal.com WhatsAppMessage us

Visit times and any assessment charge are confirmed before booking.

WhatsApp us