Renovation planning
Plan your renovation before anyone prices it
A clear brief is the difference between quotations you can compare and quotations that only look similar. Start with the rooms, the finishes and the order of work.
Stages
The order a renovation usually follows
Not every project needs every stage, but agreeing the order early avoids rework and keeps trades out of each other's way.
Survey and measure
Measurements, photographs and a record of existing services, damage and constraints.
Design decisions
Layout, finishes, fixtures and appliances agreed, with drawings where the work needs them.
Material sign-off
Samples and specifications approved before anything is ordered, with lead times noted.
Protection and strip-out
Floors, furniture and neighbouring areas protected before removal work starts.
First fix
Plumbing, electrical and AC alterations routed before walls and ceilings are closed.
Inspection
Concealed work checked, and wet areas tested, before finishes cover them.
Finishes
Waterproofing, tiling, flooring, ceilings, joinery and painting in the agreed order.
Snag and handover
A joint walk-round, a snag list, cleaning and the handover of documents.
Finishes
Try finish combinations
Colours are indicative. Final products, finishes and samples are confirmed during specification.
Decisions
What changes a renovation quotation
- Extent of strip-out
- Removing tiles, screed or joinery adds labour, disposal and making good.
- Layout changes
- Moving a sink, toilet or shower relocates supply and waste routes; keeping positions is usually simpler.
- Material grade and supply
- Named products and who supplies them change both price and programme.
- Hidden conditions
- Damp, failed waterproofing or uneven substrates found during strip-out may need extra work.
- Occupancy and access
- Working around residents, restricted hours and lift bookings affect the programme.
- Approvals
- Building or community requirements can add steps before work begins.
Renovation services
Kitchen renovation
Agreed cabinets finishes and related plumbing or electrical work.
View serviceBathroom renovation
Agreed fixtures waterproofing tiling and technical work.
View serviceGeneral property renovation
Agreed finishes and related technical alterations.
View servicePainting
Surface preparation and specified interior or exterior coating.
View serviceWooden flooring
Specified timber engineered or laminate system installation.
View serviceTile installation
Substrate assessment laying grouting and agreed finishing.
View serviceKitchen cabinet installation
Specified cabinets fitting hardware and agreed adjustments.
View serviceFAQs
Renovation planning questions
How long will my renovation take?
The programme is confirmed after the scope is assessed. Material lead times, approvals and anything found during strip-out can affect it, so a written programme is more reliable than an estimate given before measuring.
Do I need building or community approval?
Many buildings and communities require notice or approval for renovation work, sometimes with rules on working hours and debris. Check early; the brief builder includes a reminder.
Can I renovate one room at a time?
Yes. Phasing can reduce disruption in an occupied home, though it can add protection and set-up costs. The brief helps decide what to group together.