Interior fit-out for shop, mall outlet, office and restaurant operators: partitions, ceilings, flooring, finishes, joinery and the electrical, lighting, AC and plumbing changes a new layout needs, coordinated as one programme.

Overview

What fit-out works covers

A fit-out turns a bare or tired unit into a space that works for the business. It usually combines several trades in a tight sequence: setting out the layout, building partitions and gypsum ceilings, moving lighting, power points and AC outlets to suit, then flooring, painting and joinery. Classic Apex coordinates these trades as one programme so each one arrives when the space is ready for it.

Commercial fit-outs come with rules that homes do not. Malls and landlords set working hours, material standards, approval steps and handover dates, and some changes need authority approvals. These requirements are collected at the start and built into the programme, so the scope is priced on what the unit actually needs and approvals are confirmed before work begins.

Suitable for shop, mall outlet, office and restaurant operators.

When it helps

What are you noticing?

Choose the closest description to see what it usually means for the request. This is guidance, not a diagnosis.

New or relocated premises

You have taken a new shop, mall outlet, office or restaurant unit and need it fitted out to your layout and brand before opening.

Request a quotation for this

Refreshing a tired interior

The space works but looks dated: worn flooring, stained ceilings, damaged partitions or lighting that no longer suits the business.

Request a quotation for this

Changing the layout

You need more meeting rooms, a larger stock room, a new counter position or open-plan space, with power, lighting and AC moved to match.

Request a quotation for this

Scope

What the assessed scope can include

The final scope depends on the assessment and is written into your quotation.

  1. 01

    Partitions and ceilings

    The scope can include gypsum or glass partitions, suspended or gypsum ceilings, bulkheads and access panels, built to the agreed layout.

  2. 02

    MEP adjustments

    Work can include relocating lighting, adding sockets and data points, adjusting AC diffusers and grilles, and plumbing changes for pantries or washrooms, within the existing system capacity.

  3. 03

    Flooring and wall finishes

    Finishes can include tiling, vinyl, laminate or carpet, wall preparation and painting, and feature walls agreed with you.

  4. 04

    Joinery

    The scope can include counters, shelving, storage, wall panelling and doors, made or supplied to the agreed drawings and materials.

  5. 05

    Approvals coordination

    The programme can include preparing the information mall or landlord fit-out teams ask for and planning work around their inspections and rules.

  6. 06

    Handover

    Completion can include snagging, testing of the systems that were altered, a clean of the fit-out area and a handover list of works carried out.

Price factors

What changes the quotation

Classic Apex does not publish fixed prices for this service. Each quotation is based on the actual work, separating labour, materials, access equipment, disposal and applicable taxes.

Unit size and condition
The floor area and whether the unit is a bare shell or an existing fit-out to strip out set the base quantities.
Layout and drawings
The number of partitions, ceiling types and rooms, and whether drawings already exist, affect both quantities and preparation time.
MEP changes
The amount of lighting, power, AC and plumbing work, and whether the existing systems have capacity for it, can change the price significantly.
Finishes and joinery
Material choices for flooring, walls and joinery, and how much is bespoke, are often the largest variable.
Working rules
Night or out-of-hours work, mall delivery restrictions and inspection steps add time and are planned into the programme.

Key specification choices

Scope schedule
List each area with its partitions, ceiling, flooring, wall finish, joinery and MEP changes.
Material sign-off
Agree samples or product references for finishes and joinery before ordering.
Programme
Set the sequence of trades, inspection points and the target handover date.

Process

How the work is organised

Fit-out time depends on the size of the unit, the amount of MEP work, joinery lead times and the landlord's approval and inspection steps. A small refresh can take days, while a full fit-out of a new unit is planned over weeks. The programme is agreed with the quotation and kept up to date as approvals come through.

  1. Assessment

    The unit is visited and measured, existing services are checked for capacity, and the landlord or mall requirements, layout and finish expectations are collected.

  2. Quotation

    The quotation sets out each area's works, MEP changes, materials, exclusions, approvals responsibilities and a programme to the target handover date.

  3. Work

    Trades are sequenced from strip-out and partitions through MEP, ceilings and finishes to joinery, with inspection points and your approval for any variation.

  4. Completion

    The space is snagged, altered systems are tested, the area is cleaned and the works are handed over with a list of what was done.

A preferred visit time is a request. It becomes an appointment only once Classic Apex confirms it.

Preparation

How to prepare

  • Collect the mall or landlord fit-out manual and handover conditions.
  • Measure the unit or share any floor plan you have.
  • Sketch the layout you want, including counters, rooms and storage.
  • Gather photos or references for the look and finishes.
  • Note your target opening date and any fixed working hours.

Free checklist

Fit-out brief checklist

Use this checklist to brief a fit-out before asking for a quotation.

Tick what applies and add notes. Nothing is sent anywhere until you choose to request a quotation.

Go further with the renovation brief

FAQs

Fit-out works: common questions

Ask about your property
Do you work in malls?

Yes. Mall outlets and shops are a regular part of the work. Mall fit-out rules on working hours, deliveries, materials and inspections are collected at the start and planned into the programme.

Can you handle the electrical and AC changes as well?

Yes. Lighting, power points, AC diffusers and plumbing changes are coordinated with the partitions and ceilings, provided the existing systems have the capacity. If an upgrade is needed, it is identified and quoted before work starts.

Do I need drawings before asking for a quote?

Not always. A measured layout and your requirements are enough for many refresh projects. Larger fit-outs and those needing landlord or authority approval usually need drawings, and the assessment will say what is required.

Can you work outside opening hours?

Work can be planned out of hours where the landlord allows it and the trade suits, so trading is disrupted as little as possible. Out-of-hours work is set out in the quotation.

Enquire

Request a fit-out works quotation

Share the location, the work you have in mind and a few photographs. We will advise on the next step and whether a visit is needed before quoting.