Guide
How to compare an annual maintenance contract
Compare annual maintenance contracts line by line: asset schedules, planned visits, callouts, parts, exclusions and the questions to ask before signing.
By the Classic Apex team · Updated 22 October 2026 · About 5 minutes to read · For villa owners, apartment owners, landlords and property managers
An annual maintenance contract (AMC) is an agreement for routine care and defined repair support over a set period, usually twelve months. Most AMCs are built around planned preventive maintenance (PPM), which means scheduled visits to inspect and service named equipment so that small problems are picked up early. Two quotations can share the same headline and still cover very different things, so the only reliable way to compare them is line by line. This guide explains what to look for and how to put proposals on an equal footing.
Decide what you want the contract to do
Before comparing anything, write down why you want a contract at all. Common reasons include reducing the number of separate bookings you make each year, keeping AC units on a regular service cycle, having a clear route for reporting faults and making maintenance spending easier to plan. A landlord managing a property from abroad may care most about reporting and approvals. An owner living in a villa may care more about AC servicing and how repairs are arranged.
Your priorities decide which differences between quotations actually matter. A contract with more planned visits is not automatically better if what you really need is defined repair labour. Equally, a low annual figure may simply reflect a narrow scope. Note your top three priorities and keep them beside you while you read each proposal.
Check the asset schedule before the price
The asset schedule is the list of equipment and areas the contract covers. It is the foundation of every AMC, and it is where most comparison problems start. A useful schedule names each item, its location and, where practical, its type. For example, a four-bedroom villa schedule might list each split AC unit by room, the electric water heaters, the main distribution board for visual checks, the bathroom and kitchen plumbing fixtures and any external lighting that is included.
When comparing schedules, check:
- whether every AC unit is listed, including any in a maid’s room, majlis or annex
- whether in-unit plumbing and electrical fittings are covered, or only AC
- which areas are excluded, such as pools, water tanks, gardens or paving
- whether shared building systems are clearly outside an apartment scope
- whether the condition of the equipment will be recorded at the start
That last point matters. Existing faults should be noted when the contract begins, so that corrective work needed on day one is separated from ongoing cover. Without a starting condition record, it is much harder to agree later whether a repair falls inside the contract.
Compare planned visits and the tasks at each one
The number of planned visits is easy to compare, but the content of each visit matters more. Ask for the service checklist for each type of asset. For AC equipment, a planned visit might include filter cleaning, a check of the condensate drain, a look at accessible coils and a check that the thermostat responds. For plumbing, it might be a visual check of visible connections, mixers and flush mechanisms. For electrical items, it might be a visual inspection of accessible fittings and a note of any faults the occupier has reported.
Check also how visits are booked, how much notice you receive, whether a visit missed because of access problems is rescheduled within the contract and whether you receive a written note of what was found.
Understand repair support, callouts and response
This is where AMCs differ most. Some contracts cover planned servicing only, with any repair quoted separately. Others include an agreed amount of reactive labour, often expressed as a number of callouts. Read the definition of a callout carefully: does it cover one fault or one visit, is there a limit on labour time per callout, and what happens once the allowance has been used?
Response commitments also need careful reading. A response target describes how soon someone attends or makes contact. It is not the same as a repair completion time, because a repair may need parts, access or your approval first. A clear quotation keeps these two things separate and explains what counts as an emergency, which working hours apply and how requests outside those hours are handled, if at all.
Line up the proposals side by side
A simple table helps you see differences quickly. Fill in one column for each quotation you receive.
| What to compare | Quotation A | Quotation B |
|---|---|---|
| Assets and areas listed | ||
| Planned visits per year and checklist | ||
| Callouts included and how one is defined | ||
| Working hours and emergency definition | ||
| Response target, separate from completion | ||
| Parts, consumables and refrigerant treatment | ||
| Excluded systems | ||
| Optional services and how they are priced | ||
| Reporting after each visit | ||
| Contract dates, renewal and payment schedule | ||
| Taxes and other commercial terms |
If a quotation leaves a row blank, ask for it in writing. Gaps usually become disagreements later. Our guide to parts and labour in maintenance contracts explains the parts rows in more detail.
Questions to ask before you sign
- Which assets are covered, and can I see the full list with locations?
- What happens at each planned visit, and will I receive a report?
- What counts as a callout, and what happens when the allowance is used?
- Which parts, consumables and refrigerants are included, and which are charged?
- Which systems are excluded, for example lifts, fire systems, pools, gas or shared building plant?
- How are existing defects handled at the start of the contract?
- Who approves additional work, and how is it quoted?
- What are the renewal terms, and how can the contract be ended?
- Are any workmanship or parts warranties offered, and on what terms?
For apartments, ask how the contract deals with the line between your unit and the building. Shared risers, common area lighting and central cooling plant are normally handled by the building operator, so confirm with building management where that line sits for your building. If you are a tenant, confirm with your landlord who approves and pays for replacements before signing anything. The apartment AMC page sets out how in-unit scope is defined.
Remember that an AMC organises maintenance and helps with planning. It does not mean every repair is included or that equipment will never fail, so query any wording that suggests otherwise without clear written terms.
Next step
Use the AMC scope builder to list your assets, preferred visits and the repair support you want, so every quotation is prepared against the same brief. If you own a villa, the villa AMC page explains how a contract can be assessed and quoted for your property.