Coordinated renovation for villa, apartment and premises owners who want several rooms or finishes improved together, with flooring, painting, joinery and related technical works planned in one scope.

Overview

What general property renovation covers

Renovating more than one room means more than booking several trades. Electrical first-fix has to happen before ceilings close, plumbing before tiling, flooring before skirting and joinery, and painting last. When these steps are out of order, finished work gets damaged and redone. Classic Apex general renovation brings painting, flooring, tiling, electrical and plumbing alterations, cabinetry and selected AC works together under one plan, so each stage follows the last in a sensible sequence.

A clear brief makes the biggest difference to a renovation's outcome. The scope should define the rooms, the finishes chosen, who supplies materials, what approvals are needed, how existing finishes are protected and what handover looks like. Structural changes, extensions and specialist engineering sit outside general renovation and are assessed separately, so the agreed work stays within what can be properly delivered.

Suitable for villa apartment and premises owners.

When it helps

What are you noticing?

Choose the closest description to see what it usually means for the request. This is guidance, not a diagnosis.

Outdated spaces

Rooms with dated flooring, tired paint, old lighting and worn joinery that you would like to modernise together, so the finishes match, rather than piece by piece over several years.

Request a quotation for this

Multi-room upgrade

Several rooms or a whole floor renewed at once, such as bedrooms and corridors or living and dining areas, to create a consistent finish and avoid visible joins between old and new.

Request a quotation for this

Coordinated works

A project combining several trades, such as new flooring, lighting changes, painting and wardrobe fitting, where the order of work and protection of finished surfaces really matter.

Request a quotation for this

Preparing to sell or let

Owners improving a property before a sale or a new tenancy, where a defined scope, a realistic programme and a clear handover help with planning viewings or move-in dates.

Request a quotation for this

Scope

What the assessed scope can include

The final scope depends on the assessment and is written into your quotation.

  1. 01

    Brief and site survey

    The process can include discussing your goals and priorities, measuring each room and recording the existing conditions, services and any constraints on the work.

  2. 02

    Scope and specification

    The proposal can include a room-by-room scope listing finishes, materials, fittings and any drawings needed to define the work clearly before ordering.

  3. 03

    Finishes

    Work can include flooring, tiling, painting, skirting and trims, coordinated so each finish is installed in the right order and protected afterwards.

  4. 04

    Technical alterations

    The scope can include related electrical, plumbing and AC changes, such as lighting layouts, socket additions or fixture moves, assessed for feasibility.

  5. 05

    Joinery and cabinetry

    Renovation can include fitting wardrobes, kitchen or storage cabinets and internal doors, where the supply arrangement for each item is confirmed.

  6. 06

    Protection, stages and handover

    The plan can include protection of retained finishes, a staged work programme, inspections and a snag list before final handover.

Price factors

What changes the quotation

Classic Apex does not publish fixed prices for this service. Each quotation is based on the actual work, separating labour, materials, access equipment, disposal and applicable taxes.

Rooms and dimensions
The number and size of rooms and the surface areas involved set the base quantities.
Material selections
Flooring, tiles, fittings and joinery vary widely in cost, so allowances should be stated where choices are pending.
Technical changes
Moving or adding electrical, plumbing or AC elements adds work beyond the finishes themselves, and may need assessment.
Supply responsibilities
Customer-supplied materials change what is included in the quote and who manages ordering and delivery.
Occupancy and protection
Working in an occupied home needs more protection, staging and daily cleanup than an empty property.
Timing
A fixed deadline may affect how trades are sequenced and how many people are needed on site.

Key specification choices

Material schedule
Each material named with brand, range, colour and quantity, or a stated allowance where selection is pending.
Work programme
Stages, sequence and planned inspections, so you know what happens when.
Approval responsibilities
Who obtains building or authority approvals and how material sign-off is recorded.
Variation process
How changes are requested, priced and approved during the project.

Process

How the work is organised

Renovation programmes depend on the number of rooms, material lead times, approval processes, occupancy and the sequence of trades. Concealed defects found once work starts can also affect timing. The work programme is confirmed in the proposal and updated if variations or material availability change it.

  1. Assessment

    Your brief is discussed and the property surveyed: room dimensions, existing finishes and services, access constraints and any items needing specialist or structural assessment before they can be included in scope.

  2. Quotation

    A room-by-room proposal sets out the scope, materials or allowances, work stages, protection, approvals, exclusions, payment stages and handover criteria, so you can compare it fairly with other renovation quotes.

  3. Work

    After material sign-off, work follows the agreed programme, with technical first-fix completed before finishes and staged inspections at key points. Variations are described, priced and approved in writing before they proceed.

  4. Completion

    A joint walk-through produces a snag list, each item is resolved and the property is cleaned. Handover includes any agreed documentation, such as product details, and notes on looking after the new finishes.

A preferred visit time is a request. It becomes an appointment only once Classic Apex confirms it.

Preparation

How to prepare

  • List the rooms you want renovated and your priorities for each.
  • Measure approximate room dimensions or share floor plans.
  • Collect photographs or references of finishes you like.
  • Decide whether you will supply any materials.
  • Think about timing and whether the property will be occupied.
  • Share a budget range if you have one; it is optional but helps shape options.

Free checklist

Property renovation brief

Use this brief to describe your renovation before a site visit. It helps turn ideas into a scope that can be quoted accurately.

Tick what applies and add notes. Nothing is sent anywhere until you choose to request a quotation.

Go further with the renovation brief

FAQs

General property renovation: common questions

Ask about your property
Can you remove a wall as part of my renovation?

Wall removal may involve structural assessment and approvals. It is not included in general renovation by default. If you want to change the layout, mention it early so it can be assessed separately and the right specialist input arranged if needed.

Do I need to share a budget?

It is optional, but a rough range helps shape material choices and priorities, especially when several rooms are involved. Without one, the proposal can still be prepared, with allowances shown for each material so you can adjust selections up or down.

How are changes during the project handled?

Changes are requested in writing, described, priced and approved before the work proceeds. This keeps the scope clear for both sides, avoids unexpected costs at the end of the project and keeps a record of every decision made along the way.

Can I live in the property during renovation?

Often yes, with staging, protection and agreed working hours. Some stages, such as replacing flooring throughout, may be disruptive enough that you prefer to stay elsewhere for a period. The programme can be planned around how you use the property.

Enquire

Request a general property renovation quotation

Share the location, the work you have in mind and a few photographs. We will advise on the next step and whether a visit is needed before quoting.

Telephone04 582 4141 Mobile+971 52 568 4874 Emailinfo@cafmglobal.com WhatsAppMessage us

Visit times and any assessment charge are confirmed before booking.

WhatsApp us