Renovation and finishes
Bathroom renovation
Bathroom refurbishment for owners who want to replace dated fittings, change the layout or deal with a wet area that has stopped performing, planned around the work that ends up hidden behind tiles.
Overview
What bathroom renovation covers
In a bathroom, the parts you see last longest only when the parts you never see are right. Drain positions, floor falls, the waterproofing membrane and pipe joints are all buried within the first days of work. Classic Apex plans those stages, and the checks between them, before a single tile is chosen.
Projects range from a limited refresh, such as new sanitaryware, a vanity and fresh silicone, to a full strip back to the slab with new tiling and waterproofing. The two are very different in cost and outcome. A cosmetic refresh improves appearance but does not renew concealed waterproofing, and the quotation states clearly which one you are buying.
Suitable for owners and bathroom refurbishment customers.
When it helps
What are you noticing?
Choose the closest description to see what it usually means for the request. This is guidance, not a diagnosis.
A dated bathroom
The tiles, vanity and sanitaryware belong to an earlier era, the layout feels cramped, and you want a cleaner, easier-to-maintain room for daily use or before letting the property.
Request a quotation for thisWorn or failing fittings
Mixers drip, the toilet cistern runs, the vanity has swollen and the shower screen seals have perished, so piecemeal repairs are starting to cost more than a planned refresh.
Request a quotation for thisLayout or waterproofing concerns
You want to swap a bath for a walk-in shower, water pools in the wrong place, or there are signs of moisture in a neighbouring room or the ceiling below.
Request a quotation for thisScope
What the assessed scope can include
The final scope depends on the assessment and is written into your quotation.
- 01
Condition and layout review
The assessment can include checking drain locations, existing falls, visible signs of water damage, ventilation and how a new layout would sit around fixed services.
- 02
Strip-out and preparation
Work can include removing old sanitaryware, tiles and screed where agreed, then preparing walls and floor for the new build-up.
- 03
Plumbing first fix
Plumbing can include repositioning supply and waste points within practical limits, fitting concealed cisterns or mixer bodies, and pressure or leak checks before closing in.
- 04
Waterproofing and testing
A full renovation scope can include applying the specified waterproofing system to floor and wet walls, with a flood or water test before tiling, where included.
- 05
Tiling and fixtures
Finishing can include tiling to agreed falls and layout, then fitting the toilet, basin, vanity, shower set, screen and accessories.
- 06
Lighting and ventilation
Electrical items can include replacing light fittings, adding a mirror light or shaver point where suitable, and fitting a domestic exhaust fan to a confirmed outlet.
Price factors
What changes the quotation
Classic Apex does not publish fixed prices for this service. Each quotation is based on the actual work, separating labour, materials, access equipment, disposal and applicable taxes.
- Refresh or full strip-out
- Replacing fittings on existing tiles is far smaller than removing everything to the slab and rebuilding the floor and walls.
- Layout changes
- Moving the toilet, shower drain or basin means new waste routes, possible floor raising and more extensive making good.
- Fixture choices
- Concealed cisterns, thermostatic shower systems and frameless glass add parts and fitting time compared with exposed fittings.
- Tile size and layout
- Large-format tiles, mosaics, feature walls and linear drains all change the labour and preparation required.
- Access and removal
- Upper-floor bathrooms, restricted lift access and the volume of tile and screed waste affect handling and disposal.
Key specification choices
- Waterproofing system
- Name the membrane product, the areas it covers, upstand heights and how corners and pipe penetrations are detailed.
- Drain type and falls
- Choose between a point drain and a linear drain, and agree the fall direction so water reaches it.
- Slip characteristics
- Select floor tiles with slip resistance suited to a wet shower area rather than relying on appearance alone.
Process
How the work is organised
Bathroom programmes depend on how far the room is stripped, curing times for screed and waterproofing, the test stage before tiling, and delivery of sanitaryware and glass, which is often measured only after tiling. Building working-hour limits also matter in apartments. The quotation includes a proposed sequence, confirmed once materials and approvals are in place.
Assessment
The room is measured, drains and supply points are located, and visible damage, ventilation and access are noted. You explain the layout and finish you want, and whether this is a refresh or full renovation.
Quotation
The written quotation lists strip-out, plumbing changes, the named waterproofing system if included, tiling, fixtures, electrical items, supply responsibilities and test stages, together with disposal, making good and the stages at which you will be asked to inspect.
Work
Strip-out and first fix happen first, then services are checked before being concealed. Waterproofing and its test follow where included, then screed, tiling and fixture installation in the agreed order.
Completion
Fittings are checked for flow and visible leaks, drainage is run, silicone is finished, lighting and fan are tested as appropriate, and outstanding items are recorded on a snag list before handover.
A preferred visit time is a request. It becomes an appointment only once Classic Apex confirms it.
Preparation
How to prepare
- Photograph the whole room, the ceiling and any stains in rooms next to or below the bathroom.
- Note whether water pools anywhere and how long it takes to drain.
- Collect specification sheets for any fittings you have already chosen.
- Remove toiletries, cabinet contents, mirrors you want to keep and fragile items.
- Tell Classic Apex about any previous leak repairs or insurance claims.
Free checklist
Bathroom renovation planning brief
Use these points to describe your bathroom project clearly before the assessment.
Tick what applies and add notes. Nothing is sent anywhere until you choose to request a quotation.
Advice
Useful reading before you enquire
Bathroom renovation work stages
The stages of a bathroom renovation from brief to handover, the hold points where testing happens before finishes, and the decisions due at each stage.
Read more GuideClarifying waterproofing in a bathroom quote
What a bathroom quote should say about waterproofing: areas covered, the system, surface preparation, falls, testing and what a refresh leaves out.
Read more ProblemAn outdated bathroom layout or finish
Tired tiles, awkward layouts and worn fittings. How to assess an outdated bathroom, what to check safely and how to decide between a refresh and a renovation.
Read moreCan you tile over my existing bathroom tiles?
Sometimes, for walls in dry zones where existing tiles are well bonded and the extra thickness suits fittings and door frames. On floors and in showers, overlaying usually hides the condition of the waterproofing and can upset falls, so removal is often recommended. The assessment explains which approach suits each surface.
Will the bathroom be waterproofed?
Only if waterproofing renewal is listed in the quotation. A full renovation that strips to the slab normally includes a named membrane and a test. A refresh that keeps existing tiles does not renew the concealed layer, so it cannot address a failed membrane underneath.
Can I convert a bath into a walk-in shower?
Often yes, but the drain position, floor build-up and fall to the drain must work. Some conversions need the floor raised or a linear drain at the wall. The assessment checks whether a level or near-level entry is achievable before you commit.
How long will I be without the bathroom?
That depends on the scope and curing stages, so the programme is confirmed after assessment. A fixture-only refresh is much shorter than a full rebuild with waterproofing and testing. Plan for an alternative bathroom for the whole proposed period, plus a short margin.
Related
Often arranged alongside
Tile installation
Substrate assessment laying grouting and agreed finishing.
View servicePlumbing installation
Compatible fixtures and agreed water and waste connections.
View serviceSilicone sealing and regrouting
Removal preparation and specified resealing or regrouting.
View servicePart of renovation and finishes. See the full service directory.
Enquire
Request a bathroom renovation quotation
Share the location, the work you have in mind and a few photographs. We will advise on the next step and whether a visit is needed before quoting.
Visit times and any assessment charge are confirmed before booking.