Annual maintenance contracts

Building annual maintenance contract

A twelve-month maintenance arrangement for building owners and facilities managers, covering agreed common areas, units or technical assets with planned visits, corrective support and regular reporting.

Request a quotation

Scope and charges are agreed in writing before work starts.

Mid-rise commercial building facade with glazed windows

SCOPE

Agreed building assets planned visits and corrective support.

BOUNDARY

No implied lift, generator or fire-system coverage.

Overview

What building AMC covers

AMC means annual maintenance contract: a twelve-month agreement for planned servicing and defined repair support.

A building annual maintenance contract (AMC) gives a multi-asset property a defined maintenance programme for the year. Rather than reacting to each complaint from residents or tenants, the owner agrees in advance which areas and assets are inspected, how often they are serviced, how corrective work is handled and how results are reported. Classic Apex prepares the contract from an asset list built for your building.

Buildings usually already have specialist contracts in place for lifts, fire systems, generators and central cooling. A building AMC from Classic Apex does not imply coverage of these. Instead, the proposal states the boundary, records the responsible provider for each specialist system and, where agreed, includes coordination with them so defects are passed to the right party quickly.

Suitable for building owners and facilities managers.

When it helps

What are you noticing?

Choose the closest description to see what it usually means for the request. This is guidance, not a diagnosis.

Many assets to keep track of

Dozens of light fittings, several split units in common areas, washrooms on each floor and pump room fittings. An asset schedule with planned visit tasks makes sure none are forgotten.

Request a quotation for this

Owners or boards need reporting

You must show what maintenance has been done, what is outstanding and what is recommended. An agreed reporting cadence produces consistent records over the year.

Request a quotation for this

Recurring common area defects

The same corridor lights, stairwell finishes or washroom fittings fail repeatedly. Planned preventive maintenance (PPM) and trend notes in reports can show where replacement may be more sensible than repeated repair.

Request a quotation for this

Scope

What the assessed scope can include

The final scope depends on the assessment and is written into your quotation.

  1. 01

    Asset schedule

    The contract can include a register of covered assets by location and type, such as common area AC units, lighting circuits, washroom fixtures and finishes, with starting condition.

  2. 02

    Planned inspections and servicing

    Scheduled visits can include inspection rounds, AC servicing, electrical fitting checks and plumbing checks at frequencies set in the proposal.

  3. 03

    Corrective maintenance support

    Corrective support can include assessing reported defects on covered assets and completing repairs within the agreed labour terms, with other items quoted.

  4. 04

    Area boundaries

    The scope can include named common areas, selected units or both, with each area's boundary written down to avoid overlap with tenants or other contractors.

  5. 05

    Reporting cadence

    Reporting can include monthly or quarterly summaries of visits completed, defects opened and closed, approvals pending and recommendations, in a format agreed at the start.

  6. 06

    Site staffing where priced

    Where it is explicitly scoped and priced, the contract can include dedicated site technician hours, with the duties, working pattern and supervision defined in writing.

Compare contract structures

Three ways a Building AMC can be structured

Choose the structure that matches the support you want. Each proposal is prepared after the property and its assets are understood, so the scope fits the property. Use these when one of the four packages is not the right fit.

OPTION A

Planned Care

Scheduled inspections and servicing of named assets.

To define in the proposal

  • Number of planned visits
  • Asset quantities and service checklists
  • Rates for additional visits

OPTION B

Planned Care with Repair Support

Planned servicing plus an agreed level of reactive labour.

To define in the proposal

  • Callout limit and working hours
  • Labour limits per callout
  • How spare parts are charged

OPTION C

Property Specific Care

A tailored contract with selected additions for the property.

To define in the proposal

  • Asset schedule and any staffing
  • Specialist services and partners
  • Reporting and service levels
How the contract structures typically differ
ItemPlanned CarePlanned Care with Repair SupportProperty Specific Care
Assets coveredNamed listNamed listAsset schedule
Planned visitsAgreed numberAgreed numberAgreed programme
Reactive calloutsCharged separatelyAgreed allowanceAs specified
Repair labourQuoted per jobWithin agreed limitsAs specified
Spare partsQuoted for approvalAs stated in proposalAs stated in proposal
ReportingVisit recordVisit and callout recordAgreed reporting

Callout limits, spare parts and response times are written into each proposal, so you know exactly what is included.

Price factors

What changes the quotation

Classic Apex does not publish fixed prices for this service. Each quotation is based on the actual work, separating labour, materials, access equipment, disposal and applicable taxes.

Asset schedule size
The number and type of covered assets is the main driver of planned labour across the contract year.
Areas covered
Covering common areas only, selected units, or both changes the extent of inspections and corrective repairs.
Staffing need
Any on-site technician hours are priced as a distinct element of the contract, separate from planned visits.
Reporting cadence and depth
Monthly detailed reports with photographs and condition notes take more preparation time than short quarterly summaries.
Corrective labour terms
Included labour hours, callout limits and any out-of-hours arrangements all affect the annual contract value.
Parts and consumables
Lamps, filters and small fittings may be included, capped at an agreed value or charged separately.

Key specification choices

Escalation process
How defects are reported, prioritised and escalated, including to specialist contractors for systems outside the AMC.
Report template
The structure of periodic reports, agreed at the start so owners receive consistent information each period.
Service levels
Any response targets, written separately from repair completion and linked to defined working hours.
Asset register updates
How replaced or newly added assets are recorded, keeping the schedule accurate through the contract term.

Process

How the work is organised

Contract start depends on how complete the existing asset information is and whether a full survey is needed first. Approval cycles for owners or boards, notice periods on existing contracts and any initial corrective work also influence mobilisation. The planned visit calendar and reporting dates are fixed in the contract once agreed.

  1. Assessment

    A building survey confirms the covered areas, builds or verifies the asset schedule and records condition. Specialist systems outside the AMC are identified along with their current providers and contact details.

  2. Quotation

    The proposal states the asset schedule, PPM calendar, corrective support terms, staffing if any, reporting cadence, escalation process, exclusions and contract dates, ready for review by the owner or board.

  3. Work

    Inspection rounds and servicing follow the calendar. Reported defects are logged, assessed and repaired within the agreed terms, while issues on lifts, fire or other specialist systems are escalated to their providers.

  4. Completion

    Each reporting period closes with a summary for the owner. Over the term, trends in recurring defects inform recommendations, such as replacing a troublesome fitting type, and the renewal proposal.

A preferred visit time is a request. It becomes an appointment only once Classic Apex confirms it.

Preparation

How to prepare

  • Gather your asset list, drawings or previous maintenance reports.
  • List specialist contracts in place: lifts, fire, generators, central plant.
  • Decide which areas and units the AMC should cover.
  • Consider whether you need anyone on site, and for which hours.
  • Choose a reporting cadence and who receives reports.

Free checklist

Building AMC scope worksheet

Complete this worksheet before requesting a building AMC proposal. It shapes the asset schedule and avoids gaps or overlap with existing contracts.

Tick what applies and add notes. Nothing is sent anywhere until you choose to request a quotation.

Go further with the AMC scope builder

FAQs

Building AMC: common questions

Ask about your property
Does a building AMC include the lifts and fire alarm?

No. Lifts, generators and fire systems have their own specialist contracts. The AMC states this boundary clearly and can include coordination, such as passing defects to the responsible provider, but servicing and repair of those systems stay with their specialists.

What is the difference between building maintenance and a building AMC?

Building maintenance can be a one-off defect clear-up or short programme. A building AMC is a twelve-month arrangement with a fixed asset schedule, planned visits, corrective support terms and periodic reporting. Some owners begin with a defect clear-up before moving to an annual agreement.

Do we need a full-time technician on site?

Not necessarily. Many buildings are well served by scheduled visits and an agreed callout route. A dedicated technician makes sense where the volume of daily requests justifies it. Any staffing is priced explicitly, so you can compare both models side by side before deciding.

How often will we receive reports?

The cadence is agreed in the contract, commonly monthly or quarterly. Reports summarise planned visits, defects raised and closed, approvals waiting and recommendations. The format can be adjusted early in the term if it does not suit your owners or board.

Enquire

Request a building AMC quotation

Share the location, the work you have in mind and a few photographs. We will advise on the next step and whether a visit is needed before quoting.

Telephone04 582 4141 Mobile+971 52 568 4874 Emailinfo@cafmglobal.com WhatsAppMessage us

Visit times and any assessment charge are confirmed before booking.

WhatsApp us