Renovation and finishes
Kitchen renovation
A coordinated kitchen upgrade for homeowners and landlords, bringing cabinets, surfaces, tiling, lighting and related plumbing or electrical changes into one agreed scope rather than several separate jobs.
Overview
What kitchen renovation covers
A kitchen renovation involves more trades in a small room than almost any other project. Cabinets depend on wall positions, the sink depends on waste routes, the hood depends on an outlet, and lighting depends on what sits above the units. Classic Apex plans these elements together so decisions made early do not cause rework later.
Every project starts with measurements and a conversation about how you cook, store and clean. From there, materials, worktops, appliances and any service changes are specified before anything is ordered. Changes to gas, structural elements or shared building ventilation sit outside this scope and need a separate specialist arrangement agreed in advance.
Suitable for homeowners and landlords upgrading kitchens.
When it helps
What are you noticing?
Choose the closest description to see what it usually means for the request. This is guidance, not a diagnosis.
Storage that no longer works
Cupboards are too few, too deep or awkward to reach, corners are wasted and worktop space disappears under small appliances, so the layout needs rethinking rather than another shelf.
Request a quotation for thisWorn or damaged finishes
Cabinet doors are swollen near the sink, worktop edges are chipped, splashback grout is stained and the kitchen looks tired even after a deep clean.
Request a quotation for thisA layout that does not suit you
The fridge, sink and hob are badly placed for how you cook, there is nowhere to sit, or you want to open the kitchen towards the living area within non-structural limits.
Request a quotation for thisScope
What the assessed scope can include
The final scope depends on the assessment and is written into your quotation.
- 01
Measured survey and brief
Planning can include measuring walls, windows, service points and ceiling height, then recording your priorities for storage, appliances, seating and budget in a written brief.
- 02
Cabinet supply or fitting
The agreed scope can include installing specified cabinets, whether supplied through the quotation or purchased by you, with hardware, plinths and filler panels.
- 03
Worktops and splashbacks
Work can include coordinating the agreed worktop material and fitting a tiled or panel splashback, once supply responsibility and template timing have been confirmed.
- 04
Sink, tap and appliance connections
Plumbing tasks can include fitting a new sink and mixer, connecting a dishwasher or washing machine to suitable points, and adjusting accessible waste connections.
- 05
Electrical adjustments
Electrical items can include relocating or adding sockets for worktop appliances, under-cabinet lighting and suitable connections for the hood, following a check of circuit capacity.
- 06
Finishing trades
The finishing stage can include wall tiling, painting, flooring transitions and installing a domestic cooker hood to an existing suitable outlet.
Price factors
What changes the quotation
Classic Apex does not publish fixed prices for this service. Each quotation is based on the actual work, separating labour, materials, access equipment, disposal and applicable taxes.
- Extent of layout change
- Keeping the sink and hob where they are is simpler than moving them, because relocated services mean new pipe and cable routes.
- Cabinet and door specification
- Carcass board, door finish, internal fittings and soft-close hardware vary widely and make up a large share of the quotation.
- Worktop material
- Laminate, compact surfaces, quartz and natural stone differ in cost, templating, cutting and handling requirements.
- Strip-out and making good
- Removing old units and tiles can reveal damaged walls, uneven floors or concealed leaks that need repair before new work proceeds.
- Appliance arrangements
- Integrated appliances need matching housings and panels, and the number of connections affects plumbing and electrical time.
Key specification choices
- Moisture-resistant carcasses
- Agree carcass board suited to sink and dishwasher zones, and edge sealing details where water is likely.
- Worktop and sink pairing
- Choose the sink type, such as undermount or inset, together with the worktop, since one affects how the other is cut.
- Ventilation route
- Confirm whether the hood will extract to an existing suitable outlet or recirculate through filters before cabinets are ordered.
Process
How the work is organised
The programme is driven mainly by lead times for cabinets and worktops, because stone or compact worktops are often templated only once cabinets are fixed. Building permit timing, appliance deliveries and any repairs found during strip-out also affect sequencing. A proposed timeline is set out in the quotation and updated if material dates change.
Assessment
The kitchen is measured, service points and the hood outlet are located, and walls and floor are checked for condition. Your brief on storage, cooking habits, appliances and timing is recorded.
Quotation
A written proposal sets out the layout, cabinet and worktop specification, appliance responsibilities, plumbing and electrical items, finishes, exclusions, payment stages and material lead times, so you can approve each element before anything is ordered.
Work
Following material sign-off, the old kitchen is removed and services are adjusted before closing in. Cabinets, worktops and splashbacks follow, then tiling, painting and final appliance connections in the agreed sequence, with the work area protected throughout.
Completion
Doors and drawers are aligned, taps and waste are checked for leaks, sockets and lighting are tested as appropriate, and a snag list is walked through with you before handover.
A preferred visit time is a request. It becomes an appointment only once Classic Apex confirms it.
Preparation
How to prepare
- Take photographs of every wall, the ceiling and the floor, plus close-ups of the sink area and hood outlet.
- List the appliances you want, with model numbers if chosen.
- Note what annoys you about the current kitchen and what must stay.
- Plan where you will prepare food and wash up while the kitchen is out of use.
- Empty cupboards fully before strip-out begins.
Free checklist
Kitchen renovation planning brief
Fill this in before requesting a quotation so the first visit focuses on decisions rather than basics.
Tick what applies and add notes. Nothing is sent anywhere until you choose to request a quotation.
Advice
Useful reading before you enquire
Planning a kitchen renovation brief
Build a kitchen renovation brief: what to change, what to measure, how appliances and services affect layout, and what to ask before approving a quote.
Read more GuideComparing renovation quotations fairly
Compare renovation quotations on equal terms: one brief, matching quantities, named materials, allowances, exclusions, payment stages and variation rules.
Read more ProblemPoor kitchen storage
Cluttered worktops, awkward corners and cupboards that do not suit how you cook. How to assess your kitchen storage and what to share when planning changes.
Read moreCan I keep my existing appliances?
Usually yes, if they fit the new layout and are in good working order. Freestanding appliances need correct gaps and ventilation, while integrated ones need housings sized to the exact model. List what you are keeping so the cabinet plan is built around those dimensions.
Do I have to replace the whole kitchen?
No. Some kitchens only need new doors, worktops and a splashback because the carcasses are sound. Others have water-damaged base units that make a partial refresh poor value. The assessment checks the condition of each unit so a refresh and a full replacement can be compared fairly.
Who handles the gas hob connection?
Gas work is excluded from this scope. If your kitchen has a gas supply, a separately arranged specialist handles any disconnection, reconnection or alteration. Classic Apex can plan cabinet and worktop cut-outs around the hob, but will not work on the gas installation itself.
How do I compare kitchen quotations?
Check whether each quote names the carcass board, door finish, hardware brand, worktop material and thickness, and states who supplies appliances. Look for strip-out, disposal, making good and service alterations as listed items. A lower total that leaves these vague is hard to judge.
Related
Often arranged alongside
Kitchen cabinet installation
Specified cabinets fitting hardware and agreed adjustments.
View serviceCooker hood installation
Domestic hood mounting and compatible connections.
View serviceTile installation
Substrate assessment laying grouting and agreed finishing.
View servicePart of renovation and finishes. See the full service directory.
Enquire
Request a kitchen renovation quotation
Share the location, the work you have in mind and a few photographs. We will advise on the next step and whether a visit is needed before quoting.
Visit times and any assessment charge are confirmed before booking.