Advice
Property care guides
Plain-language planning advice: what to measure, what to ask, and which parts of a job are usually separate. No email needed to read any of it.
Property maintenance
Questions to settle before apartment repairs
Settle responsibility, approvals, building access and payment before apartment repairs begin, with a checklist for tenants, owners and landlords.
Read more GuideCreating a building maintenance asset list
Build a maintenance asset list for a building: what to include, which fields to record, how to mark specialist systems and how it supports PPM and AMC.
Read more GuideUseful reporting for technical facilities maintenance
What useful technical facilities maintenance reporting looks like: visit records, planned task completion, defect logs, approval requests and summaries.
Read more GuidePlanning a rental property refresh
Plan a refresh between tenancies: set the goal, record condition room by room, put function before cosmetics, and arrange access and approvals early.
Read more GuidePlanning villa maintenance
A practical villa maintenance checklist covering AC, plumbing, electrics, finishes and external areas, with advice on planning visits across the year.
Read moreAnnual maintenance contracts
Parts and labour in maintenance contracts
How maintenance contracts treat labour, callouts, spare parts, consumables and refrigerant, and what to confirm in writing before you agree to an AMC.
Read more GuideHow to compare an annual maintenance contract
Compare annual maintenance contracts line by line: asset schedules, planned visits, callouts, parts, exclusions and the questions to ask before signing.
Read more GuideSeparating restaurant premises and equipment scopes
Separate restaurant premises maintenance from cooking, gas, refrigeration, extraction and fire systems, and define where each contractor's scope ends.
Read moreAir conditioning
Questions to ask about an AC quotation
The questions to ask about an AC cleaning, repair or installation quotation, the wording to query and how to compare proposals on the same basis.
Read more GuideAC servicing and cleaning explained
The difference between AC servicing, routine AC cleaning, deep coil cleaning and duct cleaning, and how to decide which one your units actually need.
Read more GuideCooker hood installation questions
Before fitting a cooker hood, check ducted or recirculating use, the outlet, mounting, power supply and cabinet clearances, and what a quote should cover.
Read more GuideDuct cleaning and coil cleaning compared
How AC duct cleaning and deep coil cleaning differ, which systems each applies to, what a quotation should define and the signs that point to each.
Read more GuidePreparing for an AC replacement assessment
What to record, measure and decide before an AC replacement assessment, including sizing questions, approvals and what the quotation should separate.
Read more GuideGetting ready for an AC service visit
How to prepare for an AC service visit: what to share when booking, how to clear access to units, what to expect on the day and what to check afterwards.
Read moreElectrical
Information to share about an electrical fault
The safe checks and details to note before enquiring about an electrical fault, from tripping breakers to flickering lights, and what to avoid doing.
Read more GuidePlanning additional sockets and fittings
How to plan extra sockets, switches and light fittings: positions, heights, connected load, cable routes, approvals and what the quotation should define.
Read morePlumbing and drainage
Planning bathroom fixtures and connections
Plan bathroom fixtures around their connections: toilet, basin, shower, bath, water heater, fan and lighting, plus what changes when positions move.
Read more GuideWhy recurring drainage faults need assessment
Why a drain that keeps blocking usually has an underlying cause, how to log each blockage and what an assessment and quotation for drainage should define.
Read more GuideWhat information helps a plumbing enquiry
What to record and photograph when reporting a plumbing leak, the safe first steps and how to tell a fixture leak from a supply or drainage problem.
Read more GuidePlanning electric water heater replacement
How to plan an electric water heater replacement: what to record, how to think about capacity and position, safety fittings and what the quotation states.
Read moreRenovation and finishes
Bathroom renovation work stages
The stages of a bathroom renovation from brief to handover, the hold points where testing happens before finishes, and the decisions due at each stage.
Read more GuideClarifying waterproofing in a bathroom quote
What a bathroom quote should say about waterproofing: areas covered, the system, surface preparation, falls, testing and what a refresh leaves out.
Read more GuideWhat changes an exterior painting scope
The factors that change an exterior painting scope for villas and low-rise buildings: surfaces, condition, exposure, access, approvals and weather.
Read more GuideTimber, engineered wood and laminate explained
How solid timber, engineered wood and laminate flooring differ in construction, moisture tolerance, refinishing and installation, and what to ask first.
Read more GuideHow to measure a flooring project
Measure rooms for new flooring, work out net area, add a waste allowance, convert square feet and record the details a flooring quotation needs.
Read more GuidePreparing rooms for interior painting
How to prepare rooms for interior painting: deciding the scope, checking surfaces, clearing rooms and recording paint products and colours in a quotation.
Read more GuideComparing kitchen cabinet specifications
Compare kitchen cabinet quotes line by line: carcass board, door finish, edges, hinges, drawers and plinths, plus the questions to ask before ordering.
Read more GuidePlanning a kitchen renovation brief
Build a kitchen renovation brief: what to change, what to measure, how appliances and services affect layout, and what to ask before approving a quote.
Read more GuideMeasuring wall and ceiling areas for planning
How to measure wall and ceiling areas for painting, subtract doors and windows, handle L-shaped rooms and estimate litres of paint, with worked examples.
Read more GuidePlanning work in an occupied home
Plan renovation while you live at home: phasing, rooms in use, service interruptions, dust protection, working hours, access, security and daily clean-up.
Read more GuideChoosing paint finishes for different rooms
How to choose matt, low sheen, satin or gloss paint finishes for living areas, kitchens, bathrooms, woodwork and exteriors, and what to ask for each.
Read more GuideManaging material selections before work
Keep renovation material choices under control with a selection schedule, samples, allowances, lead times, customer supplied items and a clear sign-off.
Read more GuideComparing renovation quotations fairly
Compare renovation quotations on equal terms: one brief, matching quantities, named materials, allowances, exclusions, payment stages and variation rules.
Read more GuideTile considerations for wet areas
How to choose tiles for bathrooms, showers and other wet areas: slip resistance, absorption, size and falls, grout and sealant, and estimating quantities.
Read moreSpecialist property care
Questions before booking pest treatment
What to note and ask before pest treatment: the pest, occupants and pets, method and products, preparation, re-entry guidance and follow-up visits.
Read more GuideQuestions for a recurring pool care quotation
Questions to ask before agreeing recurring pool care: visit tasks, frequency, chemicals, reporting, access, missed visits, repairs and the contract terms.
Read more GuidePool cleaning and maintenance scopes
Pool cleaning and pool maintenance are different scopes. See what each covers, what is usually separate and how to choose the right arrangement.
Read more GuidePreparing access for tank cleaning
Prepare for water tank cleaning: identify the tank, confirm hatch and roof access, plan isolation and the water interruption, and agree what is recorded.
Read moreGeneral and external works
Preparing a clear handyman task list
Write a handyman task list that can be planned: one task per line, room, item, size and weight, wall type, photographs and who supplies the fixings.
Read more GuidePlanning repairs to uneven external paving
Plan repairs to uneven interlock paving: record where it has moved, consider possible causes, measure the area and know what a repair quote should cover.
Read moreEnquire
Tell us what your property needs
Share the location, the work you have in mind and a few photographs. We will advise on the next step and whether a visit is needed before quoting.
Visit times and any assessment charge are confirmed before booking.