Parts and labour in maintenance contracts
How maintenance contracts treat labour, callouts, spare parts, consumables and refrigerant, and what to confirm in writing before you agree to an AMC.
By the Classic Apex team · Updated 22 October 2026 · About 5 minutes to read · For property owners, landlords and building managers
When people compare an annual maintenance contract (AMC), the visit schedule tends to get the attention. In practice, most disagreements come later, when something breaks and the question becomes whether the labour and the parts are covered. This guide explains the common ways contracts deal with both, so you can read a proposal with the right questions in mind. It applies whether the contract is for a villa, an apartment or selected assets in a building, and whether the contract is mainly planned preventive maintenance (PPM), meaning scheduled servicing of named equipment, or includes repair support as well.
Two kinds of labour, two definitions
Labour in a maintenance contract usually falls into two groups.
Planned labour is the work carried out at scheduled visits: inspecting, cleaning and servicing the assets listed in the contract. This is normally the clearest part of a proposal, because it can be tied to a checklist and a visit calendar.
Reactive labour is work carried out when something goes wrong between visits. Contracts handle this in different ways. Some exclude it entirely and quote each repair separately. Some include a set number of callouts. Some include labour for defined categories of fault, such as minor plumbing and electrical repairs, while larger jobs are quoted separately.
Whichever model is offered, look for answers to these points:
- What counts as one callout: a single fault, a single visit or a time allowance?
- Is there a limit on the labour time within each callout?
- Which working hours apply, and how are requests outside them treated?
- Is specialist labour, such as work requiring access equipment, treated differently?
- What happens when the callout allowance has been used up?
How spare parts are usually treated
Parts are where the wording matters most. You will generally meet one of the approaches below, or a mix of them. None is automatically right; what matters is that the contract states which one applies.
| Approach | What it means | What to check |
|---|---|---|
| Parts excluded | Labour may be covered, but every part is quoted for approval | How parts are priced and how approval is requested |
| Listed parts included | Certain named items are covered, others are charged | The exact list, in writing |
| Consumables only | Small routine items are covered, larger components are not | How consumables are defined |
| Parts up to an agreed limit | Parts are covered within a stated limit, then charged | How the limit works and who tracks it |
Be cautious about any description that sounds open-ended, such as all parts included, unless the written terms explain exactly what that covers and what is excluded. Broad promises are difficult to apply consistently when a costly component fails.
Consumables, refrigerant and replacements
Consumables usually means small items used during servicing or minor repairs. The term has no fixed meaning, so ask for examples. Filters, sealant, fixings, washers and cleaning materials might be included in one contract and charged in another.
Refrigerant deserves a specific question. If an AC system needs refrigerant, the underlying reason, often a leak, should be diagnosed first. A contract that treats refrigerant as a routine top-up without diagnosis may hide a fault that keeps returning. Ask how refrigerant-related work is assessed, quoted and approved.
Equipment replacement, such as a new AC unit, water heater or pump, is normally a separate decision. A maintenance contract can identify when replacement is worth considering, but the replacement itself usually needs its own quotation covering supply, removal of the old unit, installation and any making good.
Approval, supply and records
A contract should explain how you approve chargeable work. For example, you might agree that any part above a certain value needs written approval before it is ordered, while smaller items can be replaced on the spot and listed in the visit report. Agree this threshold yourself rather than leaving it open.
Also settle these points:
- whether you can supply your own parts, and how workmanship is treated if you do
- whether replacements are like-for-like or may be upgraded with your approval
- how manufacturer warranties on new parts are recorded and passed to you
- how parts used are shown in reports and invoices
- what happens if a part is not readily available locally
For example, in an apartment contract where labour for minor repairs is included but parts are quoted, a failed toilet fill valve would be diagnosed under the contract, the replacement valve priced and approved, and the fitting labour covered. The same fault under a planned-servicing-only contract would be quoted as a separate repair, labour included. Neither is wrong, but you should know which one you are signing.
Clear records help everyone. A short report after each visit or repair, listing what was found, what was done and what was used, makes it much easier to track spending across the year and to plan renewals.
Buildings and multi-asset contracts
For a building AMC, the asset list does a lot of work. It should state which common areas, units and technical assets are covered, and which are not. Lifts, fire systems, generators, central cooling plant and other specialist systems normally sit under separate contracts with the responsible provider, so a general building contract should name them as excluded or as coordination items rather than leave them unclear.
Building managers should also ask how corrective work is escalated and approved, how reports are delivered and whether any dedicated site staff are included. Staffing should only be assumed where it is clearly priced in the proposal. Our guide on how to compare an annual maintenance contract includes a table you can use to set proposals side by side.
Next step
List your assets and decide how you want labour, parts and approvals handled using the AMC scope builder, then share it when you enquire. The building AMC page explains how an asset schedule and reporting arrangement can be assessed and quoted, and the villa AMC page covers single homes.