Row of matt kitchen cabinets with slim handles and an open drawer showing internal storage

Renovation and finishes

Kitchen cabinet installation

Fitting, replacing and adjusting kitchen cabinets for owners who have bought units, need a damaged section replaced or want doors and drawers that close properly again.

Overview

What kitchen cabinet installation covers

Cabinet installation is precision work on surfaces that are rarely straight. Floors slope, walls bow and corners are seldom square, so units have to be levelled, scribed and fixed so doors line up and worktops sit flat. Classic Apex focuses on that fitting stage, whether the cabinets come through the quotation or arrive flat-packed from your own supplier.

This page covers installing specified cabinets and hardware, replacing selected units and adjusting doors and drawers. Custom-made cabinetry and worktops are only included once a supply arrangement is confirmed in writing. If you are planning a full kitchen with new layout, plumbing and tiling, the kitchen renovation service is the better starting point.

Suitable for owners installing or replacing kitchen storage.

When it helps

What are you noticing?

Choose the closest description to see what it usually means for the request. This is guidance, not a diagnosis.

New cabinets to install

You have ordered or are about to order a kitchen from a retailer or manufacturer and need the units assembled, levelled, fixed to the wall and fitted around existing services and appliances.

Request a quotation for this

Damaged units to replace

A sink base has swollen from a leak, a wall unit has pulled away from its fixings or a carcass is broken, and you want that section replaced to match as closely as possible.

Request a quotation for this

Doors and drawers misbehaving

Doors hang unevenly, hinges have loosened, drawers stick or drop on their runners, and soft-close mechanisms have stopped working properly across several units in the kitchen.

Request a quotation for this

Scope

What the assessed scope can include

The final scope depends on the assessment and is written into your quotation.

  1. 01

    Pre-installation check

    The visit can include checking delivered units against the plan, confirming appliance dimensions and locating pipes and cables before any wall fixing.

  2. 02

    Assembly and levelling

    Installation can include assembling flat-pack carcasses, setting adjustable legs, levelling base units across uneven floors and joining units into a rigid run.

  3. 03

    Wall unit fixing

    Fixing can include mounting wall cabinets on rails or brackets suited to the wall type, at an agreed height above the worktop and hood.

  4. 04

    Doors, drawers and hardware

    Finishing can include hanging doors, fitting drawer boxes and runners, adjusting hinges for even gaps, and installing handles or push-to-open fittings.

  5. 05

    Plinths, fillers and panels

    The scope can include cutting filler strips against walls, fitting plinths and end panels, and scribing panels to uneven surfaces.

  6. 06

    Selected unit replacement

    Repair work can include removing damaged carcasses or doors and fitting replacements, subject to availability of matching sizes and finishes.

Price factors

What changes the quotation

Classic Apex does not publish fixed prices for this service. Each quotation is based on the actual work, separating labour, materials, access equipment, disposal and applicable taxes.

Number and type of units
Tall larder units, corner carousels and drawer packs take longer than standard base and wall cupboards.
Assembly required
Flat-pack kitchens need assembly time on site, whereas pre-assembled carcasses mainly need levelling and fixing.
Wall and floor condition
Out-of-level floors, hollow partition walls and uneven surfaces need extra packing, scribing and specialist fixing work.
Integrated appliances
Fitting appliance doors, housings and ventilation gaps for integrated fridges and dishwashers adds measured steps.
Removal of the old kitchen
Taking out existing units, disposing of them and making good wall fixings is a separate item.

Key specification choices

Carcass board
Agree the board type and edge banding, with a moisture-resistant option for sink and dishwasher bases.
Hinges and runners
Name the hinge and runner type, including soft-close and load ratings for deep drawers.
Wall fixing method
Choose rails, brackets and fixings matched to block, concrete or partition walls and the unit load.

Process

How the work is organised

Installation timing depends mostly on delivery of complete, undamaged cabinets, so a visit is best booked once everything has arrived and been checked. Flat-pack assembly, the number of tall or corner units and whether worktops follow on another day all shape the sequence. The proposed schedule is agreed after the assessment.

  1. Assessment

    Wall runs, ceiling height and floor level are checked against your plan, and the positions of services and appliances are confirmed. For repairs, each faulty door, drawer or unit is listed with its fault.

  2. Quotation

    The quotation sets out the units to install or replace, assembly, wall fixing, hardware, plinths and fillers, removal of old units and which items you are supplying, with exclusions such as worktops noted.

  3. Work

    Base units are set level and joined, wall units are fixed at the agreed height, then doors and drawers are hung and adjusted. Services are kept accessible for any later connection by the relevant trade.

  4. Completion

    Every door and drawer is opened and closed to check alignment and soft-close action, plinths and fillers are fitted, packaging is removed if agreed and remaining adjustments are noted with you.

A preferred visit time is a request. It becomes an appointment only once Classic Apex confirms it.

Preparation

How to prepare

  • Measure the wall runs and ceiling height and send photographs of each wall.
  • Keep all boxes, fixings and instruction leaflets together in one room.
  • Clear the floor area where units will go and remove items from any cupboards being replaced.
  • Note where the water supply, waste, sockets and hood outlet sit.
  • Photograph faulty hinges or runners if the visit is for adjustments.

Free checklist

Cabinet measurement and readiness brief

Run through this list before booking an installation or adjustment visit.

Tick what applies and add notes. Nothing is sent anywhere until you choose to request a quotation.

Go further with the kitchen checklist

FAQs

Kitchen cabinet installation: common questions

Ask about your property
Can you install cabinets I bought online?

Yes, provided the units are complete, undamaged and suitable for the space. Send the product list and kitchen plan in advance. If parts are missing or the plan does not fit the room, installation may need to pause until your supplier resolves it, which is why a pre-delivery check is helpful.

Can one damaged unit be replaced without redoing the kitchen?

Often, if a carcass of the same size can be sourced. The harder part is matching the door finish, especially on older or discontinued ranges. Photograph the door and any label inside the unit so matching options can be explored before a quotation.

Are worktops included with cabinet installation?

Not automatically. Worktops are a separate supply and fitting item because stone and compact surfaces are usually templated after cabinets are fixed. If you want them included, say so at enquiry so the quotation can show supply, templating and fitting responsibilities.

Why do my cabinet doors not line up?

Common causes are loose hinge screws, hinges knocked out of adjustment, carcasses that were not levelled, or a floor that has moved. Hinge adjustment fixes many cases. Where the carcass itself is twisted, re-levelling or refixing may be needed, which the visit can assess.

Enquire

Request a kitchen cabinet installation quotation

Share the location, the work you have in mind and a few photographs. We will advise on the next step and whether a visit is needed before quoting.

Telephone04 582 4141 Mobile+971 52 568 4874 Emailinfo@cafmglobal.com WhatsAppMessage us

Visit times and any assessment charge are confirmed before booking.

WhatsApp us