Plumbing and drainage
Plumbing installation
Installation of basins, sinks, taps, toilets and shower fittings for owners and renovation customers, connected to agreed water supply and waste points and checked for flow, drainage and leaks.
Scope and charges are agreed in writing before work starts.
SCOPE
Compatible fixtures and agreed water and waste connections.
BOUNDARY
Concealed rerouting and making good need explicit scope.
Overview
What plumbing installation covers
A new basin or kitchen sink can transform a room, but only if it fits the existing connections or the connections are adapted properly. Waste outlet height, supply pipe positions, wall fixing and fitting dimensions all need to line up. Classic Apex plumbing installation begins by checking the fixtures you have chosen against the room, so any adaptation is identified and agreed before the old fitting comes out.
Like-for-like replacements are usually the simplest. Moving a fixture, changing from a pedestal basin to a wall-hung vanity or converting a bath to a shower may mean rerouting concealed pipes and opening finishes. That work is defined separately in the quote, together with reinstatement, so you know whether tiling, plaster and paint repairs are included or need arranging.
Suitable for owners and renovation customers.
When it helps
What are you noticing?
Choose the closest description to see what it usually means for the request. This is guidance, not a diagnosis.
New basin
Replacing a basin or fitting a vanity unit, where the waste and supply positions may need adjusting to suit the new design, its height and the depth of the cabinet below.
Request a quotation for thisSink replacement
A new kitchen sink, often with a new mixer and waste, fitted into existing or new worktops, sometimes alongside dishwasher or washing machine connections that need reworking.
Request a quotation for thisShower fittings
Installing a new shower mixer, head, rail or rain shower set. Depending on the design, this may involve changes to concealed valves, outlet positions and the tiles around them.
Request a quotation for thisAltered connections
Moving a fixture to a new position, adding an outlet or changing fitting types, where new pipe routes or waste connections are needed and finishes may be disturbed.
Request a quotation for thisScope
What the assessed scope can include
The final scope depends on the assessment and is written into your quotation.
- 01
Compatibility check
The assessment can include comparing the fixture specification with the existing water and waste connections, wall type and available space.
- 02
Removal of existing fixtures
The work can include disconnecting and removing old basins, sinks, taps or toilets, capping connections where needed, with disposal stated in the quote.
- 03
Fixture installation
Installation can include fitting basins, sinks, taps, mixers, toilets and shower fittings in the agreed positions, following each manufacturer's installation guidance.
- 04
Water supply connections
The scope can include connecting hot and cold supplies with suitable fittings, and adding isolation valves so each fixture can be shut off on its own.
- 05
Waste connections
Work can include connecting wastes and traps to existing suitable outlets, with falls checked so water drains freely without gurgling.
- 06
Testing
Completion can include water flow, drainage and visible leak checks on all new connections, carried out with you before handover.
Price factors
What changes the quotation
Classic Apex does not publish fixed prices for this service. Each quotation is based on the actual work, separating labour, materials, access equipment, disposal and applicable taxes.
- Fixture model
- Wall-hung, concealed or thermostatic fittings often take longer to install and connect than standard designs.
- Quantity
- Multiple fixtures installed in one visit are planned together, which is more efficient than separate bookings.
- Supply responsibility
- Whether you supply fixtures or Classic Apex supplies them changes the material element of the quote.
- Connection changes
- Reusing existing supply and waste positions is simpler and quicker than rerouting pipework to new locations.
- Access and finishes
- Opening walls, tiles or cabinets to reach connections, and reinstating them afterwards, adds to the scope.
Key specification choices
- Fixture specification
- Make, model, dimensions and connection type of each fixture, confirmed before installation.
- Connection method
- Compatible fittings and isolation valves for each supply, and suitable traps and wastes for drainage.
- Concealed work
- Any rerouting inside walls or floors is specified with route, materials and reinstatement.
Process
How the work is organised
Scheduling depends on fixture availability, whether connections can be reused and how much rerouting or reinstatement is involved. Fixtures arriving with missing parts can delay installation, so checking the box contents early helps. In renovation projects, plumbing installation happens at defined stages around tiling and finishes.
Assessment
Fixture specifications and photographs are reviewed against the existing connections. A visit is arranged if rerouting, wall construction or dimensions need checking on site before a reliable quote can be given.
Quotation
The quote lists each fixture, removal of the old one, the connection method, any rerouting and whether making good is included. Supply responsibility for fixtures and parts is stated for each item.
Work
Water is isolated, old fixtures are removed and new fixtures are installed and connected to the supplies and wastes. Surrounding finishes are protected, and any surprise behind the old fixture is raised before proceeding.
Completion
Water is restored, flow and drainage are checked and every joint is inspected for leaks. The area is cleaned, and you are shown where each new isolation valve is so you can turn off water locally.
A preferred visit time is a request. It becomes an appointment only once Classic Apex confirms it.
Preparation
How to prepare
- Share the make and model or product page of each fixture.
- Photograph the existing fixture and its connections beneath or behind.
- Confirm whether the new fixture goes in the same position.
- Tell us whether you are supplying fixtures or want them supplied.
- Check that all parts, including wastes and fixings, are included with purchased fixtures.
- Keep spare tiles from the original installation if you have them.
Free checklist
Fixture installation readiness brief
Complete this brief before booking fixture installation. It helps avoid delays on the day.
Tick what applies and add notes. Nothing is sent anywhere until you choose to request a quotation.
Can I supply my own fixtures?
Yes. The quote then covers installation labour and connection materials only. Check that your fixtures include all their parts, such as wastes, fixings and flexible connectors, and share the specifications in advance so compatibility with your existing connections can be confirmed.
Will you need to break tiles?
Like-for-like replacements usually do not need tiles broken. Changing fixture positions or replacing concealed valves may need tiles or plaster opened to reach the pipework. The quote explains what is needed and whether reinstatement is included, which depends on matching tiles being available.
Can a basin be moved to a different wall?
It may be possible, depending on supply and waste routes, achievable falls and the wall construction. This is rerouting work that needs explicit scope, and it is often better handled within a bathroom renovation if the finishes are going to be renewed anyway.
How do you check the installation?
After connection, water is run through each fixture to check flow and drainage, and all joints are inspected for leaks under normal use. You are shown where the isolation valves are, so you can turn off water to a single fixture if it is ever needed.
Related
Often arranged alongside
Plumbing maintenance
Fixture fault assessment repairs and approved replacements.
View serviceBathroom renovation
Agreed fixtures waterproofing tiling and technical work.
View serviceKitchen renovation
Agreed cabinets finishes and related plumbing or electrical work.
View servicePart of plumbing and drainage. See the full service directory.
Enquire
Request a plumbing installation quotation
Share the location, the work you have in mind and a few photographs. We will advise on the next step and whether a visit is needed before quoting.
Visit times and any assessment charge are confirmed before booking.